To determine the minimum time required to complete the work, an optimal work allocation strategy must be employed, adhering to the given constraints:
The individual work rates are:
To minimize the total time, the fastest worker (X) should be utilized as frequently as possible. This implies X works every alternate hour, while Y and Z alternate in the remaining slots. An optimal sequence for the first six hours would involve X working for three hours and Y and Z (or Y and Y, or Z and Z) working for three hours, ensuring no one works consecutively.
Work completed in the first 6 hours:
Total work done in 6 hours .
Remaining work .
To complete the remaining work in the minimum possible time, the fastest worker, X, should be engaged. X's work rate is 1/6 of the work per hour.
Time taken by X to complete the remaining 1/8 work hours.
Converting 3/4 hours to minutes: minutes.
Therefore, the total minimum time to finish the work is 6 hours 45 minutes.
Options 1 (6 hours 15 minutes) and 2 (6 hours 30 minutes) are incorrect because the calculated minimum time required to complete the work under the given constraints is 6 hours 45 minutes. These options represent durations insufficient to complete the entire work, even with optimal worker allocation.
Option 4 (7 hours) is incorrect because it exceeds the minimum calculated time of 6 hours 45 minutes. The work can be completed more efficiently by adhering to the optimal strategy of utilizing the fastest worker (X) for the remaining task, leading to a shorter overall duration than 7 hours.